3 Years
Pipeline and piping of various geometries, pipework including flanges, valves, nozzles, and instrumentation, tank side walls and roofs, support pads, saddles and attachments, existing repairs on pipes including metallic plates, clamps or patches, and pressure vessels among others
3 L
Pre-qualified to the requirements of ASME PCC 2 and ISO 24817, fast curing at low temperatures
Light Blue (RAL 5012)
Epoxy & Epoxy Phenol Novolac